Maintenance Works at SW2 Farmway Station

SBS Transit will be conducting maintenance works on the power system at SW2 Farmway Station on the Sengkang West LRT system.

Works will be conducted after passenger service hours on the weekend of 6 and 7 April 2019 from 1.30am to 4.30am. A crane will be involved to hoist the heavy equipment up to the station. Residents are advised that there will be noise disturbance as a result but every effort will be taken to try to minimise the noise levels.

During this period, a section of Anchorvale Street in the direction of the Sengkang Sports Complex will also be closed to facilitate the maintenance works being carried out.

Please refer to the attached poster for details.